Biztalk Application Testing Life Cycle

Biztalk  Application Testing Life Cycle

Content of Biztalk Application testing comprises

1 The Function system i.e System Testing

2 Non Function Testing i.e Performance Voulume Test

3 Integartion Testing

4 UAT

In current testing Scenario we follow both the V model and Agile Testing of Biztalk appliction

Both the Model are appropriate accoding to scenario

In Scenario 1 if business know what tpo develop with less changes in requirement then follow V model .

In Scenario 2 if business having changing requirement and will want to have some thing in running then go for Agile testing - Iteration wise or on the basis of sprit .

 

Thanks

Abhishek

 

Print | posted on Saturday, August 11, 2012 12:17 AM

Feedback

# re: Biztalk Application Testing Life Cycle

Left by Trivikram at 9/14/2012 4:34 AM
Gravatar Thanks for an informative post. Keep posting.

Your comment:





 
 

Copyright © AbhishekLohani

Design by Bartosz Brzezinski

Design by Phil Haack Based On A Design By Bartosz Brzezinski