Geeks With Blogs
John Naguib "It is great to follow up with new technologies but the greater is not to lose you mind or your peace" John Naguib

I faced a situation while deploying some solution files on MOSS, there was a delay about 2 hours in deployment.

I noticed that the server Regional settings is set to Pacific time zone with daylight saving, while inside the Central administration it is set to US Central time zone.

This is an issue that was solved in the SP1 for MOSS.

As a work around you can set the time zone to GMT then deploy it will be deployed successfully.

 

Posted on Monday, April 6, 2009 11:07 AM SharePoint | Back to top

Copyright © JohnNaguib | Powered by: GeeksWithBlogs.net