BizTalk Testing
Requirement Traceability matrix tells as the test coverage of test case before Going to Next phase of testing or before GO live of the software .In Software Testing Life cycle · First of all Requirement will be gather from the Business. · Second on the basis of requirements test case will be created · Third Test case will be executed on build provided by developer · Fourth defect will be raised for failed test . · Fifth and Final go will be give when all test pass. But still how can we trust on tester ......
In BizTalk Application Testing Life Cycle -3 – Integration Testing In BizTalk Application Testing Life Cycle -1 – we have tested the Application Functionality on the basis of Function requirement agreed with the business. For Details Please Check:http://geekswithblogs... In BizTalk Application Testing Life Cycle -2 – we have tested the Application Functionality on the basis of Non Function requirement agreed with ......
In Biztalk Application Testing Life Cycle Part 2 we cover Non Fuctional Testing In Non Fuctional Testing we required test below areas as a part of Non Fuctional Testing 1 Acess Right - Filesahre, SQL, Biztalk etc2 Security Testing - Password should be encrpted 3 Connectivity Testing - In Connectivity testing we test connectivities with the stubs or External System newly build system is intracting 4 Build Verification Test5 Volume Test - How will the system will performan with Design volume , Peak ......
The Function system i.e. System Testing In the Functional System testing our approach is to test the Business Process rule i.e. functionality We test the system in following categories/ flow 1 Positive Testing 2 Negative testing We also need to check all the BP / Functional Requirement should be covered for that we need to use Quality Centre or VS2010 or Excel to maintain Traceability matrix. Description <!In Positive testing we covers all the positive flow testing scenarios such as 1 Deployment ......
Biztalk Application Testing Life Cycle Content of Biztalk Application testing comprises 1 The Function system i.e System Testing 2 Non Function Testing i.e Performance Voulume Test 3 Integartion Testing 4 UAT In current testing Scenario we follow both the V model and Agile Testing of Biztalk appliction Both the Model are appropriate accoding to scenario In Scenario 1 if business know what tpo develop with less changes in requirement then follow V model . In Scenario 2 if business having changing ......
Hi All, Sysprep creates a snapshot of a virtual machine with BizTalk Server 2010 installed for quick deployment on other virtual machines Prerequisites Before using Sysprep, you should have some knowledge of using virtual machines with Hyper-V. You should also have a virtual machine with a clean, typical installation of BizTalk Server and all of its prerequisites. Sysprep will run on Windows Server 2008 and Windows Vista with SP1. Description Sysprep creates a VHD of a BizTalk Server 2010 installation ......
Hi All
Please Refer the Biztalk Testing Guide
URL :http://code.msdn.microsoft.com/BTSTestGuide
Thanks
Abhishek Lohani
Tips to see the point before Creating Custom Adpater to Save the Cost of Quality . Please refer below blog link :- http://geekswithblogs.net/A... Cost of Quality = Cost of Prevenation + Cost of Re work (cost of Failure) + Cost of Appraisal If you see the tips before creating any Custom Adapter in BIZTALK You are saving the Cost of Failure /Cost of Re work hence increasing the Cost of Quality ......
Hi Please refer the link below before building a Custom Adapter in Biztalk . Wizards used from code plex site to build custom Adapter in Biztalk having defect that is not reproducable in System Testing or Integartion Testing that should be reproduce with soak testing or live testing i.e To Save the Cost of Quality of the software developed please refer the below link to fix defects in Requirement stage to coding stage /bloggingabout.net/blogs/we... ......