BizTalk Testing

Point to Taken Care while Microsoft SQL Patching Testing in Production

Point to Taken Care while Microsoft SQL Patching Testing in Production It very critical testing like Paching testing 1. Build the Test Environment Parrel to Production Environment i.e Staging Environment2 Check the Version of Application deployed is same as Production Environment if Staging Environment not parrel to production environment then risk of defect in production 3.Check End to End Flow of Appliction 4 Check the Eventlog entries 5 Check the performance of the Application . Thanks & RegardsAbhishek ......

Posted On Tuesday, October 29, 2013 10:09 PM | Comments (0)

Why Requirement Traceability Matrix is important for any Software Development/ Maintenance project?

Requirement Traceability matrix tells as the test coverage of test case before Going to Next phase of testing or before GO live of the software .In Software Testing Life cycle · First of all Requirement will be gather from the Business. · Second on the basis of requirements test case will be created · Third Test case will be executed on build provided by developer · Fourth defect will be raised for failed test . · Fifth and Final go will be give when all test pass. But still how can we trust on tester ......

Posted On Sunday, January 27, 2013 8:53 PM | Comments (5)

Biztalk Application Testing Life Cycle -Part 3

In BizTalk Application Testing Life Cycle -3 – Integration Testing In BizTalk Application Testing Life Cycle -1 – we have tested the Application Functionality on the basis of Function requirement agreed with the business. For Details Please Check:http://geekswithblogs... In BizTalk Application Testing Life Cycle -2 – we have tested the Application Functionality on the basis of Non Function requirement agreed with ......

Posted On Wednesday, January 23, 2013 7:56 PM | Comments (2)

Biztalk Application Testing Life Cycle Part 2

In Biztalk Application Testing Life Cycle Part 2 we cover Non Fuctional Testing In Non Fuctional Testing we required test below areas as a part of Non Fuctional Testing 1 Acess Right - Filesahre, SQL, Biztalk etc2 Security Testing - Password should be encrpted 3 Connectivity Testing - In Connectivity testing we test connectivities with the stubs or External System newly build system is intracting 4 Build Verification Test5 Volume Test - How will the system will performan with Design volume , Peak ......

Posted On Tuesday, January 22, 2013 6:54 PM | Comments (0)

Biztalk Application Testing Life Cycle Part 1

The Function system i.e. System Testing In the Functional System testing our approach is to test the Business Process rule i.e. functionality We test the system in following categories/ flow 1 Positive Testing 2 Negative testing We also need to check all the BP / Functional Requirement should be covered for that we need to use Quality Centre or VS2010 or Excel to maintain Traceability matrix. Description <!In Positive testing we covers all the positive flow testing scenarios such as 1 Deployment ......

Posted On Wednesday, September 19, 2012 10:06 PM | Comments (0)

Biztalk Application Testing Life Cycle

Biztalk Application Testing Life Cycle Content of Biztalk Application testing comprises 1 The Function system i.e System Testing 2 Non Function Testing i.e Performance Voulume Test 3 Integartion Testing 4 UAT In current testing Scenario we follow both the V model and Agile Testing of Biztalk appliction Both the Model are appropriate accoding to scenario In Scenario 1 if business know what tpo develop with less changes in requirement then follow V model . In Scenario 2 if business having changing ......

Posted On Saturday, August 11, 2012 12:17 AM | Comments (1)

Sysprep a BizTalk Server VHD

Hi All, Sysprep creates a snapshot of a virtual machine with BizTalk Server 2010 installed for quick deployment on other virtual machines Prerequisites Before using Sysprep, you should have some knowledge of using virtual machines with Hyper-V. You should also have a virtual machine with a clean, typical installation of BizTalk Server and all of its prerequisites. Sysprep will run on Windows Server 2008 and Windows Vista with SP1. Description Sysprep creates a VHD of a BizTalk Server 2010 installation ......

Posted On Wednesday, November 16, 2011 10:57 PM | Comments (2)

Biztalk Testing Guide

Hi All

Please Refer the Biztalk Testing Guide

 

URL :http://code.msdn.microsoft.com/BTSTestGuide

 

Thanks

Abhishek Lohani

 

 

Posted On Wednesday, September 28, 2011 5:54 AM | Comments (0)

Cost of Quality :BizTalk Application

Tips to see the point before Creating Custom Adpater to Save the Cost of Quality . Please refer below blog link :- http://geekswithblogs.net/A... Cost of Quality = Cost of Prevenation + Cost of Re work (cost of Failure) + Cost of Appraisal If you see the tips before creating any Custom Adapter in BIZTALK You are saving the Cost of Failure /Cost of Re work hence increasing the Cost of Quality ......

Posted On Wednesday, September 14, 2011 1:34 AM | Comments (0)

Tips :In Biztalk Building Custom Adapter

Hi Please refer the link below before building a Custom Adapter in Biztalk . Wizards used from code plex site to build custom Adapter in Biztalk having defect that is not reproducable in System Testing or Integartion Testing that should be reproduce with soak testing or live testing i.e To Save the Cost of Quality of the software developed please refer the below link to fix defects in Requirement stage to coding stage /bloggingabout.net/blogs/we... ......

Posted On Saturday, September 10, 2011 11:12 AM | Comments (3)