Geeks With Blogs
Abhishek Lohani HP Accredited Integartion Specialist ALM

In Biztalk Application Testing Life Cycle Part 2 we cover Non Fuctional Testing

In Non Fuctional Testing we required test below areas as a part of Non Fuctional Testing

1 Acess Right - Filesahre, SQL, Biztalk etc

2 Security Testing - Password should be encrpted

3 Connectivity Testing - In Connectivity testing we test connectivities with the stubs or External System newly build system is intracting

4 Build Verification Test

5 Volume Test - How will the system will performan with Design volume , Peak Volume & More than Peak Volume

6 Operability Test

7 Alert Testing

8 Saok testing

Thanks

Abhishek

 

 

Posted on Tuesday, January 22, 2013 6:54 PM BizTalk Testing | Back to top


Comments on this post: Biztalk Application Testing Life Cycle Part 2

No comments posted yet.
Your comment:
 (will show your gravatar)


Copyright © AbhishekLohani | Powered by: GeeksWithBlogs.net | Join free